Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Ashley, D B and Bonner, J J (1987) Political Risks in International Construction. Journal of Construction Engineering and Management, 113(03), 447–67.

Borges, S K (1987) Roller‐Compacted Concrete Pavement: U.S. Air Force Decision Model. Journal of Construction Engineering and Management, 113(03), 480–7.

C. William, I and Ashley, D B (1987) Impact of Various Construction Contract Clauses. Journal of Construction Engineering and Management, 113(03), 501–21.

Duff, A R (1987) Interference in Stochastic Flow‐line Models. Journal of Construction Engineering and Management, 113(03), 385–98.

Friedrich, D R, Daly, J P and Dick, W G (1987) Revisions, Repairs, and Rework on Large Projects. Journal of Construction Engineering and Management, 113(03), 488–500.

Gilly, B A, Touran, A and Asai, T (1987) Quality Control Circles in Construction. Journal of Construction Engineering and Management, 113(03), 427–39.

Halpin, D W, Paulson, B C, Schub, A and Willenbrock, J H (1987) Construction Education and Research in Central Europe. Journal of Construction Engineering and Management, 113(03), 468–79.

Hester, W T, Kuprenas, J A and H. Randolph, T (1987) Arbitration: A Look at its Form and Performance. Journal of Construction Engineering and Management, 113(03), 353–67.

Maloney, W F and McFillen, J M (1987) Influence of Foremen on Performance. Journal of Construction Engineering and Management, 113(03), 399–415.

  • Type: Journal Article
  • Keywords: Productivity; Motivation; Labor relations; Employment; Supervision;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1987)113:3(399)
  • Abstract:
    A sample of unionized construction workers from a major midwestern city is surveyed to gather their perceptions of the behavior of their foreman. There are 703 participants in the study. Five dimensions of foreman behavior are identified: (1) The degree of participation allowed by the foreman in decision‐making; (2) the level of support provided by the foreman; (3) the degree of achievement orientation of the foreman; (4) the degree of bias of the foreman; and (5) the level of work facilitation provided by the foreman. The five dimensions have varying relationships with worker motivation, performance, and satisfaction.

Maloney, W F and McFillen, J M (1987) Worker Perceptions of Contractor Behavior. Journal of Construction Engineering and Management, 113(03), 416–26.

Naouin, S G and Langford, D (1987) Management Contracting—The Client's View. Journal of Construction Engineering and Management, 113(03), 369–84.

Rogge, D F and Tucker, R L (1987) Research Needs in Steel and Concrete Construction. Journal of Construction Engineering and Management, 113(03), 440–6.

Staab, G E (1987) Inspection Checklist for Sheet Pile Construction. Journal of Construction Engineering and Management, 113(03), 525–8.